Figure 40: Final site plan of the 1985
excavations at the Hennepin Avenue Bridge (from Tordoff and Clouse 1985). The black dots
were existing approach bridge support columns. The suspension bridge tower bases are
towards the top (1854 bridge on right) and the anchor tunnels are at the bottom.